Guidelines for Safe and Reliable Instrumented Protective Systems / Edition 1

Guidelines for Safe and Reliable Instrumented Protective Systems / Edition 1

by CCPS (Center for Chemical Process Safety)
ISBN-10:
0471979406
ISBN-13:
9780471979401
Pub. Date:
05/04/2007
Publisher:
Wiley
ISBN-10:
0471979406
ISBN-13:
9780471979401
Pub. Date:
05/04/2007
Publisher:
Wiley
Guidelines for Safe and Reliable Instrumented Protective Systems / Edition 1

Guidelines for Safe and Reliable Instrumented Protective Systems / Edition 1

by CCPS (Center for Chemical Process Safety)
$205.95 Current price is , Original price is $205.95. You
$205.95 
  • SHIP THIS ITEM
    Qualifies for Free Shipping
  • PICK UP IN STORE
    Check Availability at Nearby Stores

Overview

This book explains the decision-making processes for the management of instrumented protective systems (IPS) throughout a project's life cycle. It uses the new IEC 61511 standard as a basis for the work processes used to achieve safe and reliable process operation. By walking the reader through a project's life cycle, engineering, maintenance, and operations, the information allows users to easily focus on their responsibilities and duties. Using this approach, the book is useful as a primer, guidelines reference, and resource manual. Examples provide the added "real-world" experience applications.

Product Details

ISBN-13: 9780471979401
Publisher: Wiley
Publication date: 05/04/2007
Edition description: BK&CD-ROM
Pages: 430
Product dimensions: 6.38(w) x 9.49(h) x 1.03(d)

About the Author

Since 1985, the Center for Chemical Process Safety (CCPS) has been the world leader in developing and disseminating information on process safety management and technology. CCPS, an industry technology alliance of the American Institute of Chemical Engineers (AIChE), has published over 80 books in its process safety guidelines and process safety concepts series.

Read an Excerpt

Click to read or download

Table of Contents

Acknowledgements.

Preface.

List of Figures.

List of Tables.

INTRODUCTION.

1.1 Purpose.

1.2 Target Audience.

 Book Road Map.

1.4 Management Commitment.

PLANNING.

2.1 Protective Management System Lifecycle.

2.2 Why It Makes Good Business Sense.

2.3 Documentation.

2.4 Good Engineering Practices.

2.5 Key Management System Elements.

2.6 Special Topics.

RISK ASSESSMENT.

3.1 Intended Audience.

3.2 Input Information.

3.3 Basic Work Process.

3.4 Output Documentation.

3.5 Key Management System Elements.

3.6 Special Topics.

DESIGN.

4.1 Intended Audience.

4.2 Input Information.

4.3 Basic Work Process.

4.4 Output Documentation.

4.5 Process Requirements.

4.6 I&E Requirements.

4.7 Functional Assessment.

4.8 Key Management System Elements.

4.9 Special Topics.

ENGINEERING, INSTALLATION, COMMISSIONING AND VALIDATION.

5.1 Intended Audience.

5.2 Input Information.

5.3 Basic Work Projects.

5.4 Output Documentation.

5.5 Hardware.

5.6 Software.

5.7 Factory Acceptance Test.

5.8 Installation Plans.

5.9 Commissioning Plans.

5.10 Verify Operator and External Interfaces.

5.11 Validation.

5.12 Management of Change.

OPERATIONAL AND MECHANICAL INTEGRITY.

6.1 Intended Audience.

6.2 Input Information.

6.3 Basic Work Process.

6.4 Output Documentation.

6.5 Operating Procedures.

6.6 Bypass management Procedure.

6.7 Maintenance Procedures.

6.8 Training.

6.9 Managing Changes.

6.10 Monitoring performance.

CONTINOUS IMPROVEMENT.

7.1 Intended Audience.

7.2 Input Information.

7.3 Basic Work Process.

7.4 Output Documentation.

7.5 Determining Path Forward.

DEFINITIONS.

PROTECTION LAYERS.

B.1 Inherently Safer Design.

B.2 Control.

B.3 Supervisory.

B.4 Preventive.

B.5 Mitigative.

B.6 Barriers.

B.7 Limitation.

B.8 Response.

CORE ATTRIBUTES.

C.1 Independence.

C.2 Functionality.

C.3 Integrity.

C.4 Reliability.

C.5 Auditability.

C.6 Access Security.

C.7 Management of Change.

UNDERSTANDING FAILURE.

D.1 Caution-It's A Benchmark.

D.2 A "Bathtub"; Viewpoint.

D.3 Failure Types.

D.4 Failure Classification.

D.5 IPF Performance metrics.

D.6 Spurious Trip Rate.

D.7 Example Application.

PROCESS EQUIPMENT RELIABILITY DATABASE.

USER APPROVED EQUIPMENT AND PRACTICES.

F.1 User Approved.

F.2 Evolution of Plant Automation.

F.3 Logic Solver Considerations.

F.4 Field Device Considerations.

F.5 Utilities.

F.6 Wiring Practices.

F.7 Communications and Interconnectivity.

F.8 Prescriptive Design.

References.

Acronyms and Abbreviations.

Index.

From the B&N Reads Blog

Customer Reviews